Some updates from the last couple of days:

Rather than running conduit all over the house, we have a conduit from the media center to the drop ceiling.
 photo Slide27.jpg

Insulation is in the newly constructed left wall:
 photo Slide29.jpg

Received my second shipment of cables from monoprice. This mainly had coax, and wall plates to run subwoofer cable:
 photo 1015-006.jpg

and stereo/mono cables for the harmony remote setup:
 photo Slide41.jpg

The four sub locations now have a coax cable as backup, in case the wireless fails:
 photo Slide26.jpg

 photo Slide28.jpg

And last, but not the least my speakers and receiver arrived.
 photo e92e4802-05eb-42f0-87ea-c3881ba3d6fc.jpg